I finished sewing the patchwork blocks together a few days ago and yesterday I delivered all of the components – patchwork, batting and backing – to a friend who is going to quilt it on her long arm machine.
The horizon is clear as far as sewing projects go so I decided that it was time to make a serious effort to clean up and sort out the fabrics, patterns etc. Many of these are gifted, thrifted, hand-me-downs or scraps.
I probably should have started with the bits and pieces on top but I dived straight in to the contents of the cube shelving. The top two rows are rearranged although the cupboards are currently empty while I decide on what to put in them.
The shelving units were repurposed from our walk-in wardrobe and the spare bedroom. Most but not all of the contents came with us when we moved from Queensland just over 2 years ago. While everything was unpacked and stashed in the various cubes there was not a great deal of thought as to how it was arranged.
I am determined that I am going to assess everything before putting it away. There is no point in hanging onto things for which I have no possible future use. Additionally, I am setting aside the UFO’s (unfinished objects) to work through. However, the first priority is to have the sewing machine serviced. Apart from needing a general overhaul the thread cutter is blunt, the needle threader is broken and the clutch on the bobbin winder is slipping.
In the interest of full disclosure this is a view of the tables covered with piles of fabric which I have hauled out of some of the lower cubes.
It is going to take some time but I am likely to be without my machine for a couple of weeks after I drop it off on Tuesday so I will focus on the sorting without being distracted and tempted to sew something.

