In Record Time

Leave a comment

Another day, another sewing project. Unlike the patchwork this was completed in what must be record time for me. It was less than 36 hours from the moment that I decided that I needed a small bag to take to a wedding next weekend until the said item was completed.

This small black bag was my initial inspiration.

Since my frock is navy I decided that silver would be my best option. A dig around in my stash of fabric revealed this heavy satin pillowcase. I had acquired it through fabric donations for Boomerang bags but this is not really suitable so I had set it aside.

I then found some cord which I had salvaged when unpicking a cushion cover. I could not believe my luck that the colour matched, too.

I unpicked a piece of the pillowcase which proved to be a particularly good quality heavy fabric.

I did not really want a perfectly plain bag so I headed off to the local Salvos op shop and managed to find some sequins and beads for a total outlay of $3. I now have enough to make about 100 bags!! Embroidery and embellishment are not really my skills but I felt sure that I could create something that would suit my needs. A quick Youtube tutorial to discover how to make French knots. No embroidery thread so I used regular sewing thread. No pattern or design so I made it up as I went along.

Making a start.

I did not want to overdo it so decided that this was enough.

Then it was time to create the actual bag. It is open at the top and fully lined using part of a well-worn navy pillowcase. There is also an internal side pocket. I did not have a pattern so the actual construction was designed on the run. I handstitched the cord to the sides of the bag as the final step.

I am happy with the result and am looking forward to using it next week.

Different Decluttering

Leave a comment

Our small acreage provides us with plenty of opportunities to build and create in our garden. For the first 13 years that we lived here we were constrained by available time as we were both working full-time. However, that did not diminish our enthusiasm, ideas and the ability to collect materials.

Here are some of the projects we have completed in the past couple of years.

I have written previously about our plans to create an entertaining area under the house so part of the long-term strategy has been to sort and tidy a lot of the materials that are stored there.

During the past few days we have had a bit of a blitz to identify what can realistically be used, what is just rubbish and what we can pass onto other people.

These are some of the last pieces of salvaged Colorbond sheeting which were gratefully collected yesterday after I listed it to giveaway on a local Facebook group.

One of the things we definitely plan to use is the old kitchen sink. When we had the kitchen renovated almost 12 years ago we salvaged it with a view to building an outdoor sink close to the vegetable garden. This would help to eliminate the amount of dirt and unwashed produce that was brought into the kitchen.

Yesterday GMan removed the original taps and plumbing. We cut some timber to length to make the framing and stand. Here are the first pieces in position.

GMan will paint all of the timber before the frame is assembled so it will be a little while before it is completed. More on that another day.

Meanwhile, we recently acquired some more material but it was not stored anywhere. We used an offcut of vinyl flooring to cover the concrete is one corner of the workshop to make a small home gym area.

We are pleased with the ongoing progress.

Something for Nothing

Leave a comment

Remember those pavers we salvaged not so long ago?  You can read about it here.  Apart from saving them from landfill, we had a couple of projects in mind.  Once the builders realised that we were serious about salvaging and re-using as much of the materials as we could, they even collected the spent crusher dust (about a cubic metre) and left it in a neat pile beside the driveway.

Last weekend GMan used some of the crusher dust as a bedding for the paving under the new walkway.  He then cleaned and relaid the pavers.

2018-09-17 01

The edges are yet to be finished but we are really pleased with how it has turned out so far.

The fresh mulch was the other piece of work GMan did.  He dug up the last small area of turf between the end of the native verge planting and the walkway and mulched it.

There are still plenty of pavers and crusher dust left and we have other plans for those so watch this space.

Meanwhile, I was not being entirely idle.  I finished transplanting the beans which had come up self-sown in the bed where I grew them earlier in the year.

2018-09-17 02

Here is the corn I planted 3 weeks ago.  I think all but one of the seeds have germinated.

2018-09-17 03

Two of the other garden beds have been sown with seeds – one with cucumber and the other with rockmelon and a sprinkling of lettuce.  No photos as there is nothing to show yet.

Going, Going………Not Quite Gone

1 Comment

Last weekend we did some more demolition work on the old chicken coop.  We have been fairly careful in how we went about it because it was our goal to salvage most of the materials for use in future projects.  There is now only one piece of chain wire to remove and then the posts.

IMG_4088

The Colorbond sheeting from the roof and walls will come in handy for some of the remaining raised garden beds that we are planning to construct.  The posts have been earmarked for use in building the perimeter fence of the vegetable garden.  That was the reason that we fenced the new chicken run before the vegetable garden as the posts for the run were taller so had to be purchased.

The woodshed which is in the foreground of the photo will be retained and some minor modifications made to it.

IMG_4089

I will also be making some changes to how the wood is stored.  Although it cannot be seen in this photo, I had wood stacked quite high against the side wall.  I use the past tense of ‘had’ as recently there was a tremendous crash during the night and we have now discovered that my carefully stacked wood has collapsed and is now a disorganised jumble on the ground.  I suspect that some of the local wildlife was instrumental in this event.

As always, there is always another project lurking in the background, even if it is only in our minds at this stage.  Once the structure is completely removed this will open up the possibility of having at least one large limb lopped from one of the jacaranda trees.  There is also a very large boulder which has dislodged from higher up the mountain and is resting against part of the old fence at the top of the block.  We may remove the fencing to allow the rock to roll to the bottom of the garden (another ‘meteorite feature?) before repairing the fence.

Then there are the possibilities of what to do with the area where the chicken run was but I will save that discussion for another day.