Project Preparation

1 Comment

Well, I had a couple of days off from blogging as we have been out and about. Yesterday WordPress decided it did not want to play the game when I tried to write this post. However, all seems to be well again and I am back in business.

Over the last couple of days we have purchased some materials and equipment for the next DIY project. 

For a number of years we have talked about creating a defined entertaining area under our high-set house.  When we first moved here over 14 years ago, this area was simply sloping dirt which was of absolutely no use and merely contributed to the dirt and dust which made its way into the house.  So, we had the area concreted , albeit on a couple of levels.  Since then it has really been a storage area for materials collected for future projects as well as overflow from the workshop area.  We had decided that the best approach was to screen off an area for casual entertaining using battens and the remainder could still be used for storage.  After literally years of discussion and refinements of the design we are ready to begin.

Initially, we planned to use salvaged hardwood for the rails but realised that we could not source enough timber of consistent dimensions that was straight and true so we opted for new timber from Bunnings in this instance.  After carefully measuring and calculating our requirements we bought the necessary lengths whilst ensuring the minimum amount of waste.

2020-06-24 02
The other major requirement for this project which GMan had identified was a saw which would make a quick and accurate cut.  There were 21 rails to be cut plus approximately 170 (yet to be purchased) battens.  He decided on this mitre saw and stand.

2020-06-24 01

The rails were cut to length in no time and are now ready to be painted.  We also need to sand and paint the rusted steel posts before attaching the rails.  

This is clearly not a job which will be done in a week but we are confident that our planning and preparation will ensure the success of the end result.

I am looking forward to being able to use the entertainment area during the summer as our summers are becoming increasingly hotter and this area is definitely the coolest place in the house.

 

 

Something Different

2 Comments

As I mentioned at the end I my previous post, I spent the remainder of yesterday far away from my sewing machine.

If you think of the room with my sewing machine as my hobby area then the workshop is GMan’s hobby space.  From time to time we have a clean up and usually declutter a few more things.  Yesterday we had another go but this time the focus was the contents of the storage cupboards under the bench rather than some of the bigger garden items.

We decided to move all of the various jars and containers of nails, screws, rivets etc from the shelf in the cupboard to this set of shelves which we had inherited and mounted on the wall some time ago.  We had not really used the shelves but it is now much easier to see what we actually have.

2017-01-22-01

I finally found a solution for storing the various extension cords.  This metal bracket which came from my father’s workshop has been mounted just above the bench.

2017-01-22-02

We could not complete the final bit of organisation until today as we needed to buy some plastic plugs to allow us the screw into the concrete block wall to mount the shelf to the left of this photo.

2017-01-22-03

We have yet to put anything on it but there is plenty to choose from.  The shelf beside it was the subject of one of my very early blog posts – almost 6 years ago.

I found it interesting to re-read that old post because I realised that all of the items mentioned today actually belonged to my father – even the re-purposed tins cans for storing screws – on the bottom shelf of the first photograph.

And what inspired us to do all of this?  It was trying to find suitable screws and the correct size drill bit for another handyman project.  That will be revealed tomorrow.